Broadcasting Infrastructure
IIHF U18 and U18 Women’s World Championships · Host Regulations · Championship Planning · Event Venues And Facilities
42.1The Host shall provide sufficient and suitable space and infrastructure in the arena for TV and Radio broadcasting (the “Broadcasting Infrastructure”).
42.2The Broadcasting Infrastructure shall include, but is not limited to, the availability of electricity, telephone lines, internet connections, and TV facilities like camera podiums and camera installations at the ceiling (e.g., video goal judge camera), walls, etc.
42.3The Host shall provide space for TV studios upon request by the respective TV companies, but not creating any loss on spectator seats (“Seat Kills”). Requests shall be made not later than eleven (11) months before the Championship.
42.4If that is, however, not feasible, then such space shall be provided with a minimum of seat kills. Requests shall be made before ticket sales start.